The basic renovation of the swimming pool began on February 1.2.2023, XNUMX. All facilities in the swimming hall are closed due to renovation.
Situation 28.11.: Bitumen work has started on the water roof of the swimming pool, which may cause temporary odor nuisance to the environment. After the bitumen works, insulation work will start on the water roof.
Waterproofing and tiling have started on the inside. Casting of floors, masonry and building engineering work continue. Outside, the frame work of the expansion section continues.
The construction site area has been expanded to the park side for the safety of the environment. The freight traffic of the construction site continues to run along the light traffic route. Although all transports are driven with appropriate caution, we still urge caution when moving around the construction site.
Maauimala will serve an extended season again in 2024.