The permit decision defines which inspections will be carried out during the construction work. Order the inspections, unless otherwise stated, from building control no later than three days before they are delivered. The builder or his representative must be present at the inspection. The builder must ensure that the site inspection document can be inspected and/or signed by the inspector at the construction site.
Order a view of the terrain measurements of the area of responsibility for land use primarily by email.
The bottom inspection is carried out when the reinforcement of the sensor is visible before the casting work
The site survey is carried out when the foundation wall of the building or similar construction work has been completed. Order a view of the terrain measurements of the area of responsibility for land use primarily by email.
The structural inspection is carried out after the building's frame and other load-bearing structures have been completed. These structures may not be covered before the structural inspection.
The inspection of the oil heating system is carried out within three months of the commissioning of the oil heating system. The installation company orders an inspection from the rescue authority.
A partial final inspection will be carried out before the premises are put into operation. The general conditions for commissioning are set out in a separate appendix. Read more about the partial final review.
The final inspection is carried out when the building and yard arrangements are complete. The building and the surroundings must be in a condition according to the approved drawings.
Measurement engineer
Vitality
Terrain measurement, border display.
Building inspector
Vitality
Building supervision, electronic transactions, building permits, landscape work permits, inspections, guidance and advice.
Building inspector
Vitality
Building supervision, building permits, inspections, guidance and advice
Building Control Manager
Vitality
Building supervision, building supervision area manager, special plans, building permits, inspections, guidance and advice