Parks and outdoor sports venues

The City of Riihimäki builds and has built parks and green areas as well as outdoor sports facilities. The Municipal Engineering Investment Work Programme 2026 has been approved by the Technical Committee (25 November 2025 § 154)

The most important work sites for parks and green areas and outdoor sports venues in 2026

  • The Hirsimäki sports field was renovated in 2025, and artificial sand turf and a year-round ice rink were installed. In 2026, the field will continue to be renovated, including fencing the area.

  • The general plan for the Peltosaari park complex was approved in September 2025. Construction planning for the park complex is underway and construction of the park will begin in 2026.

    On November 10, 2025, as part of the financial and action plan, the City Council approved project-level funding for municipal technology investments, including the strategic flagship project of Peltosaari Park.

  • Basic improvement of parks refers to investments made to improve the condition of existing parks and playgrounds.

    Basic improvement targets for 2026:

    • Hännintie playground
    • Landscaping of the playground to be removed from Härkätie
    • Renovation of the Bad Segeberg park pond (more information below)
  • The Bad Segeberg pond located on Peltosaari has a lot of algae in the summer, which also makes the surrounding park area feel uncomfortable.

    According to the pond's action recommendation made in 2024, it is important to improve the water circulation of the pond in order to curb eutrophication. This will be implemented by pumping water from the Vantaanjoki River to the northern end of the pond. This will require the construction of a pump well and a pressure pipe in the section between the pond and the river. In addition, a new, higher bottom dam will be built, which will provide more water depth in the pond, which will slow down eutrophication.

Available plans

The plan proposals will be held for public viewing at Virastokeskus Vetur, Eteläinen Asemakatu 4.

SpeciesNeighborhoodPlanDrawing numberAnnouncement, available for viewing
Park planRäätykänmäkiMaster plan for Hännintie playground
Hännintie playground park plan report
general plan_9582-17.1.-21.1.2026
Park planRäätykänmäkiLandscaping plan for the playground to be removed from Härkätie
Härkätie park plan report
general plan_9587-17.1.-21.1.2026
Lighting planForkLighting plan for the pedestrian and cycling routes of Ainonpuisto and Pellavapuisto
Ainonpuisto and Pellavanpuisto lighting plan report
site plan and cross section_UV18-01
site plan and cross section_UV18-02
8.12. – 22.12.2025
Park planPeltosaariPeltosaari park complex master plan
Peltosaari Park Plan Report
general plan_9573-116.6. – 30.6.2025
Landscaping plan for the green area of ​​PihakatuKirjausTellervonpolku landscaping plan
Tellervonpolku street environment report
general plan_9560-1 17.3. – 31.3.2025
Park planKirjausBerry Park Master Plan
Marjapuisto park plan report
general plan_9559-117.3. – 31.3.2025
Basic improvement plan for an outdoor sports venueLog hillHirsimäki sports field renovation plan
Planning report for the basic renovation of the Hirsimäki sports field
station drawing_9562-1
cross-sections_9562-2
19.2. – 5.3.2025
Park planWood ravenPiekana's park route plan
Plan description of Piekana park
station drawing_9549-1
length and type cross-section_9549-2
31.7. – 14.8.2024
Park planJuppalaGeneral plan of the Kantakatu playground
Kantakatu playground plan description
general plan_9522-116.4. – 1.5.2024
Park and square planJokikyläCheck out the plans here9.2. – 25.2.2024
Park planParooninmäkiGeneral plan of the Savottapuisto local sports facility
Plan description of the Savottapuisto neighborhood sports center
general plan_9521-1
18.1.-1.2.2024
Park planField villageThe park route plan for the pedestrian and cycling connection between Hämeenaukio and Torikuja
The pedestrian and cycling connection between Hämeenaukio-Torikuja description of the park plan
station drawing_9523-1
length and type cross-section_9523-2
8.12.-21.12.2023
Basic improvement plan for the parkLog hillGeneral plan of Hirsimäenpuistogeneral plan_9492-128.6.-11.7.2023
Basic improvement plan for an outdoor sports venueHarjukyläBasic improvement plan for the tennis courts of the central sports park

Plan report for the basic improvement of the tennis courts
station drawing_9493-1
structural and section view, dimensioning and drying plan_9493-2
12.4-26.4.2023
Basic improvement plan for the parkKoivistonmäkiThe general plan of Töyrypuistogeneral plan_9490-110.3-24.3.2023
Park planHuhtimoKanervapuisto general plangeneral plan_9489_110.3-24.3.2023
Basic improvement plan for the parkHarjukyläGlass blower's park renovation plan
The plan description of the glassblower's park
green area plan_9188-13.1-17.1.2023

Written reminders

During the mentioned period, those whose rights are affected by the matter have the opportunity to submit their written reminders addressed to the technical sector: