The purpose of the zoning was to expand the existing industrial area of Parooninmäki to its south side and designate a larger, unified block area of industrial and warehouse buildings that do not cause environmental disturbances. At the same time, parts of the Pajakatu and Rantatie and Junttatie street areas that were not implemented according to the plan in force in the planning area were removed. Local recreation areas and Vantaanjoki as a water area were assigned to the side of Vantaanjoki and the eastern part of the area.
The area to be zoned included the block area of industrial and warehouse buildings (694-9-1-2), the street areas of Rantatie, Pajakatu and Junttatie, as well as the unzoned field and forest area. The plan area is approximately 23 ha in size.
The area is mainly owned by a private landowner, and the zoning was started at the request of the landowner. The zoning work was done as a consultant under the guidance and supervision of the city of Riihimäki. A land use agreement was drawn up in connection with the site plan and changes to the site plan.
Statements attached to the plan statement:
Appendix 6 Water supply report
Appendix 7 An overview of the city
Appendix 8 Land use plan
Appendix 10 Flood risk assessment
Appendix 11 Storm water clearance
Appendix 12 Traffic report
Appendix 13 Noise modeling
Appendix 14 Archaeological research
Appendix 15 Archaeological preliminary investigation
Appendix 16 Nature survey
Other reports prepared for the planning area:
The site plan and site plan change came into effect on 15.3.2015 March XNUMX
Participation and evaluation plan (15.3.2015/13.11.2020/XNUMX, updated XNUMX/XNUMX/XNUMX)
The Parooninmäki T site plan draft was available for viewing on 16.10. – November 3.11.2017, 30 (MRL § 4) on the notice board of the urban planning area of responsibility at Eteläinen Asemakatu XNUMX and on this website.
Station plan map, draft
Site plan report, draft
A presentation and discussion event was held on October 23.10.2017, XNUMX.
Memo of the presentation and discussion session
The City Council decided at its meeting on 23.11.2020 November 364 (§ 26.11.2020) to make Parooninmäki's site plan and the site plan change proposal available for viewing. The proposal was available for viewing from 15.1.2021 November 4 to 3 January XNUMX on this website and on the zoning notice board at Eteläinen Asemakatu XNUMX (XNUMXrd floor).
At its meeting on February 4.2.2021, XNUMX, the city council decided to present the site plan and the site plan amendment for approval by the city council.
In its decision on March 8.3.2021, 22, the city council approved Section XNUMX of Parooninmäki's site plan and site plan amendment.
City council meeting minutes
The Parooninmäki T site plan and the change to the site plan have entered into force on April 28.4.2021, XNUMX.
Site plan map, legally binding
Site plan report, legally binding
Urban planner
Vitality
Planning Manager
Vitality