Change of station plan

The area's partially unrealized site plan was confirmed in 1973. Over the decades, the three-story commercial and residential apartment buildings have not been implemented in accordance with the site plan. Four detached lots with old detached houses in the area have become the city's property. It is necessary to draw up a site plan change for part of the plots, which enables a high-quality residential apartment building on the new plot to be created, taking into account the comfort of the neighbors.

The city's goal is to bring more residents to the city in terms of planning and affordability to the center for a new apartment building plot.

In the planning review 2021, it has been suggested that one plot with an area of ​​approximately 3 m² could be created in the area. The plot efficiency can be increased from the e=000 efficiency of the current site plan in such a way that it would be possible to build a four-story residential apartment building with an area of ​​approximately 0.5 m² on the plot. The current used building right is less than 3 k-m².

During the plan process, the construction law goal of the plan change has been refined in such a way that in the draft made available for viewing again, 3 k-m² is presented as the building right for the plot. At the same time, the location of the new apartment building has been changed so that the building mass is presented near the northern border of the plot.

Stages of the station plan

  • The station layout change has come into effect on 29.8.2021 August XNUMX (announcement in Aamuposti and on the website)
    Participation and evaluation plan (updated 26.4.2022/XNUMX/XNUMX)

  • The draft of the site plan change at Kaivokatu 6-8 was available for viewing between February 14.2 and March 15.3.2022, 30 (MRA § 4) on this website and at the Riihimäki office center in Vetur at Eteläinen Asemakatu 3 (XNUMXrd floor).

    Plan draft material:
    Plan draft map with regulations
    Plan draft description with attachments

    A presentation and discussion event on the draft plan was organized on January 15.2.2022, XNUMX.
    Memo of the presentation and discussion session

  • Kaivokatu 6-8 site plan change draft II was available for viewing between June 6.6 and June 27.6.2022, 30 (MRA § 4) on this website and at the Riihimäki office center in Vetur at Eteläinen Asemakatu 3 (XNUMXrd floor).

    Plan draft material:
    Plan map with regulations, draft II
    Plan description with attachments, draft II

    A presentation and discussion event on the draft plan was organized on January 7.6.2022, XNUMX.
    Memo of the presentation and discussion session

  • At its meeting on September 19.9.2022, 6, the City Council decided to make the proposal for the Kaivokatu 8-26.9 site plan change available for viewing. The proposal was on display on 28.10.2022. – 65 October 27 (MRL § 4, MRA § 3) on the Riihimäki zoning notice board at Eteläinen Asemakatu XNUMX (XNUMXrd floor) and on this website.

    Design proposal material:
    Plan proposal map with regulations
    Statement of plan proposal with attachments

  • The plan amendment is intended to be prepared for approval by the City Board and Council in May-June 2026.

See the destination in the map service