The aim of the site plan change is to use the plot more efficiently than the current site plan. In the plan proposal, the purpose of use of the plot remains as a block area of residential, commercial and office buildings. The building right for the plot increases to 1 sq.m. In the reference plan, a 170-7-story residential apartment building is presented on the Junailijanjakatu side, and a 8-story residential apartment building on the Hämeenkatu side, with retail space also located on the street level. The goal is the high-quality implementation of the plot and the adaptation of the construction to its surroundings.
The site plan change has been made at the landowner's request. The site plan work is done as a consultant under the guidance and supervision of the city of Riihimäki. The applicant is responsible for all the costs of preparing the site plan and the costs incurred by the city. In connection with the change in the site plan, a land use agreement is made before the plan is approved.
The approximately 1 m² plot is owned by Riihimäki Kotikulma Oy. The area to be zoned is located in a central location, along Hämeenkatu, and is part of the dense downtown structure. The plot between Hämeenkatu and Junailijankatu is currently undeveloped.
The aim of the site plan change is to use the plot more efficiently than the current site plan. The change in the station plan responds to residential construction that enables population growth near the train station and downtown services. The population growth brought about by the plan change supports the preservation and development of downtown services. The project contributes to the goals of downtown development, which is one of the flagship projects of the Riihimäki strategy.
On 23.11.2020 November 367, § XNUMX, the City Council has decided that the plan change is agreed to and that the plan change will be drawn up based on the reference plans under the conditions listed in more detail in the decision.
The station plan change has started on 20.12.2020 December XNUMX (announcement in Aamuposti and on the website)
Participation and evaluation plan
The draft of the site plan change for Hämeenkatu 20 – Junailijankatu 11 was on view on March 8.3. – 6.4.2021 April 30 (MRA § 4) on the Riihimäki zoning notice board at Eteläinen Asemakatu 3 (XNUMXrd floor) and at www.riihimaki.fi/kaavoitus.
Station plan map, draft
Site plan report, draft
A presentation and discussion event on the draft plan was organized remotely on June 17.3.2021, XNUMX.
Memo of the presentation and discussion session
At its meeting on May 10.5.2021, 20, the City Council decided to put the proposal for the site plan change for Hämeenkatu 11 – Junailijankatu XNUMX on display.
The proposal was available for viewing on 17.5. – 22.6.2021 June 65 (MRL § 27, MRA § 4) Riihimäki office center in Veturi at Eteläinen Asemakatu XNUMX and www.riihimaki.fi/kaavoitus.
At its meeting on October 4.10.2021, XNUMX, the city council decided to present the city council with the approval of the site plan change.
The city council approved the amendment to the site plan for Hämeenkatu 20 – Junailijankatu 11 on 15.11.2021/117/XNUMX § XNUMX.
The amendment to the site plan for Hämeenkatu 20 – Junailijankatu 11 has entered into force on January 7.1.2022, XNUMX.
Online announcement on 7.1.2022 January XNUMX
Legal formula material:
Site plan map, legally binding