Harjukylä, Hämeenkatu 48-50, Rity

Oblique aerial view of Hämeenkatu 48-50 in spring and winter

Station plan change

The change in the site plan is intended to change the use of the plot into a block area (AL) of residential and commercial buildings, which will be assigned commercial premises at street level on the Hämeenkatu side. Construction areas for two apartment buildings with floor numbers 4-5 and 8-9 are assigned to the plot. The lower building is located along Valtakäyrä and the higher one at the end of Hämeenkatu. The combined floor space of the apartment buildings assigned to the plot is approx. 4500 m2. In addition to this, building rights are assigned to the plot for business premises and common spaces related to living. The goal is to add quality to Riihimäki's city center.

  • Kiinteistö Oy Riihimäen Hämeenkatu 48 has made plans with its partner T2H Rakennus Oy for the building located on the plot, the so-called About replacing the Rity building with a new residential and commercial building. The project requires changing the site plan and demolishing the building on the site.

    The city's demolition permit was granted to the existing building in 2017. In the statement requested by the city about the demolition application, the Finnish Museum Agency states, among other things: Rity-talo is not located in a nationally significant built cultural environment. Only half of the original plan has been implemented. The building has been repaired several times, so that you can hardly see the original interiors. In addition, the building would require large investments in renovation measures. Consequently, the Museum Agency does not object to the requested demolition permit. However, since the building is located in an urban-impressive location at the end of Hämeenkatu, special attention must be paid to the quality and implementation of the new construction as well as adaptation to the environment.

    Kiinteistö Oy Riihimäen Hämeenkatu 48 has applied for a site plan change for the plot it owns 694-1-9010-20. The area of ​​the plot is 3 m084. The plot that is the subject of the site plan change has a site plan from 2. The site for commercial and office buildings (K) has a building right of 1992 m2.

    At its meeting on June 11.6.2018, XNUMX, the City Council has decided to approve the development of a site plan amendment for the plot with the aim of e.g. the following principles:
    The land's purpose of use will be changed to a block area (AL) of residential and commercial buildings, which will be assigned commercial premises at street level on the Hämeenkatu side. Construction areas for two apartment buildings with floor numbers 4-5 and 8-9 are assigned to the plot. The lower building is located along Valtakäyrä and the higher one at the end of Hämeenkatu. The combined floor space of the apartment buildings assigned to the plot is approx. 4500 m2. In addition to this, building rights are assigned to the plot for business premises and common spaces related to living. The goal is to add quality to Riihimäki's city center.

Detailed planning progress

  • The station layout change came into effect on March 10.3.2019, XNUMX (announcement in Aamuposti and on the website).
    Participation and evaluation plan (19.3.2019, updated 17.6.2021 and 17.8.2022)

  • Hämeenkatu 48-50 Rity site plan change draft was available for viewing on 11.10. – 9.11.2021 November 30 (MRA § 4) on the Riihimäki zoning notice board at Eteläinen Asemakatu 3 (XNUMXrd floor) and www.riihimaki.fi/asu-ja-rakenna/kaavoitus.

    The announcement of availability has been published on the website on October 10.10.2021, XNUMX.

    Station plan map, draft
    Site plan report, draft
    Draft reference plan

    A presentation and discussion event on the draft plan was organized on January 19.10.2021, XNUMX.
    Memo of the presentation and discussion session

  • At its meeting on August 17.8.2022, 48, the City Council decided to put the proposal for the site plan change at Hämeenkatu 50-22.08 Rity on display. The proposal was available for viewing on 27.09.2022. – 65 September 27 (MRL § 4, MRA § 3) on the Riihimäki zoning notice board at Eteläinen Asemakatu XNUMX (XNUMXrd floor) and on this website.

    Design proposal material:
    Station plan map, proposal
    Site plan report, proposal

    Observation photo: view from Valtakatu to the north. The planned buildings are partially behind the Kolmiopuisto park even during the leafless time of year.
    Observation photo: view from Valtakatu to the north.

     

    Observation picture: view from the intersection of Valtakakatu and Hämeenkatu towards the west. The taller 7-9-story one stands out from the rest of the environment clearly. The buildings delimit the street space in an urban way. building
    Observation picture: view from the intersection of Valtakakatu and Hämeenkatu towards the west.

     

    Observation picture: view from Hämeenkatu towards the south. Facade surfaces with different materials and colors give rhythm to the large building in such a way that it creates the impression of a smaller building. On the ground floor of the building on the Hämeenkatu side, there is a business space that enlivens the cityscape.
    Observation picture: view from Hämeenkatu towards the south.

     

    Observation picture: view along Hämeenkatu to the north. The building forms a landmark-like viewpoint on Hämeenkatu.
    Observation picture: view along Hämeenkatu to the north.

     

  • At its meeting on October 24.10.2022, XNUMX, the city council decided to present to the city council the approval of the site plan change and the plot division and plot division change.

    The city council approved the amendment to the site plan for Hämeenkatu 48-50 Rity and the amendment to the plot division and plot division on 12.12.2022 December 129 § XNUMX.

    Approved formula material:
    Approved plan map with regulations
    Approved Formula description with attachments

  • The amendment to the Hämeenkatu 48-50 Rity site plan, as well as the plot division and the change in plot division, has entered into force on February 2.2.2023, XNUMX.

    Online announcement about the validity of the law on 2.2.2023 October XNUMX.

    Legal planning material:
    Legal plan map with regulations
    Legally valid Plan Statement with attachments

See the destination in the map service Jump over the embedded map: See the destination in the map service

More information